Report Detail

The global data center construction market is expected to grow from USD 15,635.56 million 2017 to USD 25,653.55 million by the end of 2024 at a Compound Annual Growth Rate (CAGR) of 7.33%.

On the basis of environmental controls, the global data center construction market is studied across CCTV, Cooling Solutions, Facility Management and Access Systems, HVAC Assets, and Racks.

On the basis of power construction, the global data center construction market is studied across Data Center Lighting, Electrical Panels Switch Gear, Generator, Enclosures & Cabling, N+1 UPS Systems, Transfer Switches, and Utility Improvements.

On the basis of type, the global data center construction market is studied across Tier 1, Tier 2, Tier 3, and Tier 4.

On the basis of application, the global data center construction market is studied across Aerospace & Defense, Banking, Financial Services & Insurance, Consumer Goods & Retail, Energy & Utilities, Government & Public Sector, Healthcare & Life Sciences, Manufacturing, Media & Entertainment, and Telecommunication.

On the basis of geography, the global data center construction market is studied across Americas, (United States, Brazil, Canada, Mexico, and Argentina) Europe, Middle East & Africa, (United Kingdom, Germany, France, Saudi Arabia, United Arab Emirates, Italy, and Russia) and Asia-Pacific (China, Japan, India, and Australia).

“ABB Ltd: The potential growing player for the global data center construction market”

The key players profiled in the global data center construction market are ABB Ltd, AECOM, Arup Group Limited, CORGAN, DPR Construction, Data Center Technologies, Equinix, Inc., Gensler, Interxion, Khazna, and Schneider Electric.

The report provides insights on the following pointers:
1. Market Penetration: Provides comprehensive information on sulfuric acid offered by the key players in the global data center construction market.
2. Product Development & Innovation: Provides intelligent insights on future technologies, R&D activities, and new product developments in the global data center construction market.
3. Market Development: Provides in-depth information about lucrative emerging markets and analyzes the markets for the global data center construction market.
4. Market Diversification: Provides detailed information about new products launches, untapped geographies, recent developments, and investments in the global data center construction market.
5. Competitive Assessment & Intelligence: Provides exhaustive assessment of market shares, strategies, products, and manufacturing capabilities of the leading players in the global data center construction market.


Table of Contents

    1. Preface

    • 1.1. Objectives of the Study
    • 1.2. Market Segmentation & Coverage
    • 1.3. Years Considered for the Study
    • 1.4. Currency & Pricing
    • 1.5. Stakeholders

    2. Research & Forecasting

    • 2.1. Research Methodology
      • 2.1.1. Research Instruments
        • 2.1.1.1. Secondary Instrument
        • 2.1.1.2. Primary Instrument
      • 2.1.2. Research Approaches
        • 2.1.2.1. Bottom-up Approach
        • 2.1.2.2. Top-down Approach
      • 2.1.3. Research Reliability & Validity
      • 2.1.4. Research Assumptions
      • 2.1.5. Vendor Inclusion Criteria
    • 2.2. Forecasting Methodology
      • 2.2.1. Methodology for Market Estimation & Forecasting
      • 2.2.2. Significance and Importance of the Market Estimation & Forecasting

    3. Executive Summary

      4. Premium Insight

      • 4.1. Market Connectivity
      • 4.2. Market Data Feed
      • 4.3. Market Vendor Ranking Analysis
      • 4.4. Market Dynamics
        • 4.4.1. Drivers
        • 4.4.2. Restraints
        • 4.4.3. Opportunities
        • 4.4.4. Challenges
      • 4.5. Porter’s Five Forces Analysis
        • 4.5.1. Threat of New Entrants
        • 4.5.2. Threat of Substitutes
        • 4.5.3. Bargaining Power of Customers
        • 4.5.4. Bargaining Power of Suppliers
        • 4.5.5. Industry Rivalry

      5. Global Data Center Construction Market, by Environmental Controls

      • 5.1. Introduction
      • 5.2. CCTV
      • 5.3. Cooling Solutions
      • 5.4. Facility Management and Access Systems
      • 5.5. HVAC Assets
      • 5.6. Racks

      6. Global Data Center Construction Market, by Power Construction

      • 6.1. Introduction
      • 6.2. Data Center Lighting
      • 6.3. Electrical Panels Switch Gear
      • 6.4. Generator, Enclosures & Cabling
      • 6.5. N+1 UPS Systems
      • 6.6. Transfer Switches
      • 6.7. Utility Improvements

      7. Global Data Center Construction Market, by Type

      • 7.1. Introduction
      • 7.2. Tier 1
      • 7.3. Tier 2
      • 7.4. Tier 3
      • 7.5. Tier 4

      8. Global Data Center Construction Market, by Application

      • 8.1. Introduction
      • 8.2. Aerospace & Defense
      • 8.3. Banking, Financial Services & Insurance
      • 8.4. Consumer Goods & Retail
      • 8.5. Energy & Utilities
      • 8.6. Government & Public Sector
      • 8.7. Healthcare & Life Sciences
      • 8.8. Manufacturing
      • 8.9. Media & Entertainment
      • 8.10. Telecommunication

      9. Global Data Center Construction Market, by Geography

      • 9.1. Introduction
      • 9.2. Americas Data Center Construction Market
        • 9.2.1. Americas Data Center Construction Market, by Country
          • 9.2.1.1. United States
          • 9.2.1.2. Brazil
          • 9.2.1.3. Canada
          • 9.2.1.4. Mexico
          • 9.2.1.5. Argentina
        • 9.2.2. Americas Data Center Construction Market, by Environmental Controls
        • 9.2.3. Americas Data Center Construction Market, by Power Construction
        • 9.2.4. Americas Data Center Construction Market, by Type
        • 9.2.5. Americas Data Center Construction Market, by Application
      • 9.3. Europe, Middle East & Africa Data Center Construction Market
        • 9.3.1. Europe, Middle East & Africa Data Center Construction Market, by Country
          • 9.3.1.1. United Kingdom
          • 9.3.1.2. Germany
          • 9.3.1.3. France
          • 9.3.1.4. Saudi Arabia
          • 9.3.1.5. United Arab Emirates
          • 9.3.1.6. Italy
          • 9.3.1.7. Russia
        • 9.3.2. Europe, Middle East & Africa Data Center Construction Market, by Environmental Controls
        • 9.3.3. Europe, Middle East & Africa Data Center Construction Market, by Power Construction
        • 9.3.4. Europe, Middle East & Africa Data Center Construction Market, by Type
        • 9.3.5. Europe, Middle East & Africa Data Center Construction Market, by Application
      • 9.4. Asia-Pacific Data Center Construction Market
        • 9.4.1. Asia-Pacific Data Center Construction Market, by Country
          • 9.4.1.1. China
          • 9.4.1.2. Japan
          • 9.4.1.3. India
          • 9.4.1.4. Australia
        • 9.4.2. Asia-Pacific Data Center Construction Market, by Environmental Controls
        • 9.4.3. Asia-Pacific Data Center Construction Market, by Power Construction
        • 9.4.4. Asia-Pacific Data Center Construction Market, by Type
        • 9.4.5. Asia-Pacific Data Center Construction Market, by Application

      10. Competitive Strategic Window

      • 10.1. Introduction
        • 10.1.1. Leverage Zone
        • 10.1.2. Vantage Zone
        • 10.1.3. Speculative Zone
        • 10.1.4. Bottleneck Zone

      11. FPNV Positioning Matrix

      • 11.1. Introduction
      • 11.2. Scores
        • 11.2.1. Forefront
        • 11.2.2. Pathfinders
        • 11.2.3. Niche
        • 11.2.4. Vital
      • 11.3. Business Strategy
      • 11.4. Product Satisfaction

      12. Competitive News Feed Analysis

        13. Company Usability Profiles

        • 13.1. ABB Ltd
        • 13.2. AECOM
        • 13.3. Arup Group Limited
        • 13.4. CORGAN
        • 13.5. DPR Construction
        • 13.6. Data Center Technologies
        • 13.7. Equinix, Inc.
        • 13.8. Gensler
        • 13.9. Interxion
        • 13.10. Khazna
        • 13.11. Schneider Electric

        14. Appendix

        • 14.1. Top Reports
        • 14.2. Author Details

        LIST OF TABLES (52 TABLES)

          TABLE 1. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, 2016 - 2024 (USD MILLION)

            TABLE 2. GLOBAL DATA CENTER CONSTRUCTION MARKET RANKING, BY VENDORS, 2017

              TABLE 3. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ENVIRONMENTAL CONTROLS, 2016 - 2024 (USD MILLION)

                TABLE 4. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CCTV, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                  TABLE 5. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SOLUTIONS, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                    TABLE 6. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY FACILITY MANAGEMENT AND ACCESS SYSTEMS, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                      TABLE 7. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY HVAC ASSETS, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                        TABLE 8. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY RACKS, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                          TABLE 9. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER CONSTRUCTION, 2016 - 2024 (USD MILLION)

                            TABLE 10. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER LIGHTING, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                              TABLE 11. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ELECTRICAL PANELS SWITCH GEAR, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                TABLE 12. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GENERATOR, ENCLOSURES & CABLING, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                  TABLE 13. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY N+1 UPS SYSTEMS, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                    TABLE 14. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TRANSFER SWITCHES, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                      TABLE 15. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY UTILITY IMPROVEMENTS, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                        TABLE 16. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TYPE, 2016 - 2024 (USD MILLION)

                                          TABLE 17. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER 1, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                            TABLE 18. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER 2, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                              TABLE 19. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER 3, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                TABLE 20. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER 4, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                  TABLE 21. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY APPLICATION, 2016 - 2024 (USD MILLION)

                                                    TABLE 22. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY AEROSPACE & DEFENSE, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                      TABLE 23. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY BANKING, FINANCIAL SERVICES & INSURANCE, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                        TABLE 24. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSUMER GOODS & RETAIL, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                          TABLE 25. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ENERGY & UTILITIES, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                            TABLE 26. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GOVERNMENT & PUBLIC SECTOR, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                              TABLE 27. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY HEALTHCARE & LIFE SCIENCES, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                                TABLE 28. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY MANUFACTURING, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                                  TABLE 29. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY MEDIA & ENTERTAINMENT, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                                    TABLE 30. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TELECOMMUNICATION, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                                      TABLE 31. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GEOGRAPHY, 2016 - 2024 (USD MILLION)

                                                                        TABLE 32. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, 2016 - 2024 (USD MILLION)

                                                                          TABLE 33. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY ENVIRONMENTAL CONTROLS, 2016 - 2024 (USD MILLION)

                                                                            TABLE 34. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER CONSTRUCTION, 2016 - 2024 (USD MILLION)

                                                                              TABLE 35. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY TYPE, 2016 - 2024 (USD MILLION)

                                                                                TABLE 36. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY APPLICATION, 2016 - 2024 (USD MILLION)

                                                                                  TABLE 37. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, 2016 - 2024 (USD MILLION)

                                                                                    TABLE 38. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY ENVIRONMENTAL CONTROLS, 2016 - 2024 (USD MILLION)

                                                                                      TABLE 39. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER CONSTRUCTION, 2016 - 2024 (USD MILLION)

                                                                                        TABLE 40. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY TYPE, 2016 - 2024 (USD MILLION)

                                                                                          TABLE 41. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY APPLICATION, 2016 - 2024 (USD MILLION)

                                                                                            TABLE 42. ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET SIZE, 2016 - 2024 (USD MILLION)

                                                                                              TABLE 43. ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET SIZE, BY ENVIRONMENTAL CONTROLS, 2016 - 2024 (USD MILLION)

                                                                                                TABLE 44. ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER CONSTRUCTION, 2016 - 2024 (USD MILLION)

                                                                                                  TABLE 45. ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET SIZE, BY TYPE, 2016 - 2024 (USD MILLION)

                                                                                                    TABLE 46. ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET SIZE, BY APPLICATION, 2016 - 2024 (USD MILLION)

                                                                                                      TABLE 47. 360IRESEARCH SCORES FOR FOREFRONT IN DATA CENTER CONSTRUCTION MARKET

                                                                                                        TABLE 48. 360IRESEARCH SCORES FOR PATHFINDERS IN DATA CENTER CONSTRUCTION MARKET

                                                                                                          TABLE 49. 360IRESEARCH SCORES FOR NICHE IN DATA CENTER CONSTRUCTION MARKET

                                                                                                            TABLE 50. 360IRESEARCH SCORES FOR VITAL IN DATA CENTER CONSTRUCTION MARKET

                                                                                                              TABLE 51. 360IRESEARCH FPNV POSITIONING MATRIX BUSINESS STRATEGY FOR DATA CENTER CONSTRUCTION MARKET

                                                                                                                TABLE 52. 360IRESEARCH FPNV POSITIONING MATRIX PRODUCT SATISFACTION FOR DATA CENTER CONSTRUCTION MARKET

                                                                                                                  LIST OF FIGURES (46 TABLES)

                                                                                                                    FIGURE 1. GLOBAL DATA CENTER CONSTRUCTION MARKET: YEARS CONSIDERED FOR THE STUDY

                                                                                                                      FIGURE 2. GLOBAL DATA CENTER CONSTRUCTION MARKET: KEY RESEARCH METHODOLOGY

                                                                                                                        FIGURE 3. GLOBAL DATA CENTER CONSTRUCTION MARKET: KEY RESEARCH INSTRUMENTS

                                                                                                                          FIGURE 4. GLOBAL DATA CENTER CONSTRUCTION MARKET: KEY SECONDARY INSTRUMENT SOURCES

                                                                                                                            FIGURE 5. GLOBAL DATA CENTER CONSTRUCTION MARKET: KEY POTENTIAL RESPONDENTS

                                                                                                                              FIGURE 6. GLOBAL DATA CENTER CONSTRUCTION MARKET: KEY BREAKDOWN OF PRIMARY INSTRUMENT

                                                                                                                                FIGURE 7. GLOBAL DATA CENTER CONSTRUCTION MARKET: KEY RESEARCH APPROACHES

                                                                                                                                  FIGURE 8. GLOBAL DATA CENTER CONSTRUCTION MARKET: KEY DATA TRIANGULATION

                                                                                                                                    FIGURE 9. GLOBAL DATA CENTER CONSTRUCTION MARKET: KEY RESEARCH ASSUMPTIONS

                                                                                                                                      FIGURE 10. DATA CENTER CONSTRUCTION MARKET: KEY MARKET CONNECTIVITY

                                                                                                                                        FIGURE 11. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, 2016 - 2024 (USD MILLION)

                                                                                                                                          FIGURE 12. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ENVIRONMENTAL CONTROLS, 2017 VS 2024 (USD MILLION)

                                                                                                                                            FIGURE 13. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CCTV, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                              FIGURE 14. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SOLUTIONS, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                FIGURE 15. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY FACILITY MANAGEMENT AND ACCESS SYSTEMS, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                  FIGURE 16. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY HVAC ASSETS, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                    FIGURE 17. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY RACKS, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                      FIGURE 18. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER CONSTRUCTION, 2017 VS 2024 (USD MILLION)

                                                                                                                                                        FIGURE 19. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER LIGHTING, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                          FIGURE 20. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ELECTRICAL PANELS SWITCH GEAR, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                            FIGURE 21. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GENERATOR, ENCLOSURES & CABLING, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                              FIGURE 22. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY N+1 UPS SYSTEMS, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                FIGURE 23. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TRANSFER SWITCHES, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                  FIGURE 24. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY UTILITY IMPROVEMENTS, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                    FIGURE 25. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TYPE, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                      FIGURE 26. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER 1, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                        FIGURE 27. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER 2, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                          FIGURE 28. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER 3, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                            FIGURE 29. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER 4, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                              FIGURE 30. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY APPLICATION, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                FIGURE 31. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY AEROSPACE & DEFENSE, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                  FIGURE 32. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY BANKING, FINANCIAL SERVICES & INSURANCE, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                    FIGURE 33. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSUMER GOODS & RETAIL, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                      FIGURE 34. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ENERGY & UTILITIES, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                        FIGURE 35. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GOVERNMENT & PUBLIC SECTOR, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                          FIGURE 36. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY HEALTHCARE & LIFE SCIENCES, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                            FIGURE 37. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY MANUFACTURING, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                              FIGURE 38. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY MEDIA & ENTERTAINMENT, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                                FIGURE 39. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TELECOMMUNICATION, BY GEOGRAPHY, 2017 VS 2024 (USD MILLION)

                                                                                                                                                                                                  FIGURE 40. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GEOGRAPHY, 2017 (USD MILLION)

                                                                                                                                                                                                    FIGURE 41. 360IRESEARCH COMPETITIVE STRATEGIC WINDOW FOR GLOBAL DATA CENTER CONSTRUCTION MARKET, BY ENVIRONMENTAL CONTROLS, 2024

                                                                                                                                                                                                      FIGURE 42. 360IRESEARCH COMPETITIVE STRATEGIC WINDOW FOR GLOBAL DATA CENTER CONSTRUCTION MARKET, BY POWER CONSTRUCTION, 2024

                                                                                                                                                                                                        FIGURE 43. 360IRESEARCH COMPETITIVE STRATEGIC WINDOW FOR GLOBAL DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2024

                                                                                                                                                                                                          FIGURE 44. 360IRESEARCH COMPETITIVE STRATEGIC WINDOW FOR GLOBAL DATA CENTER CONSTRUCTION MARKET, BY APPLICATION, 2024

                                                                                                                                                                                                            FIGURE 45. 360IRESEARCH COMPETITIVE STRATEGIC WINDOW FOR GLOBAL DATA CENTER CONSTRUCTION MARKET, BY GEOGRAPHY, 2024

                                                                                                                                                                                                              FIGURE 46. 360IRESEARCH FPNV POSITIONING MATRIX FOR DATA CENTER CONSTRUCTION MARKET

                                                                                                                                                                                                              Summary:
                                                                                                                                                                                                              Get latest Market Research Reports on Data Center Construction . Industry analysis & Market Report on Data Center Construction is a syndicated market report, published as Global Data Center Construction Market - Premium Insight, FPNV Positioning Matrix, Competitive News Feed Analysis, Company Usability Profiles, Market Sizing & Forecasts to 2024 (Q4 2018 Update). It is complete Research Study and Industry Analysis of Data Center Construction market, to understand, Market Demand, Growth, trends analysis and Factor Influencing market.

                                                                                                                                                                                                              Last updated on

                                                                                                                                                                                                              REPORT YOU MIGHT BE INTERESTED

                                                                                                                                                                                                              Purchase this Report

                                                                                                                                                                                                              $4,499.00
                                                                                                                                                                                                              $5,499.00
                                                                                                                                                                                                              $6,499.00
                                                                                                                                                                                                              3,477.73
                                                                                                                                                                                                              4,250.73
                                                                                                                                                                                                              5,023.73
                                                                                                                                                                                                              4,188.57
                                                                                                                                                                                                              5,119.57
                                                                                                                                                                                                              6,050.57
                                                                                                                                                                                                              686,952.31
                                                                                                                                                                                                              839,642.31
                                                                                                                                                                                                              992,332.31
                                                                                                                                                                                                              379,715.60
                                                                                                                                                                                                              464,115.60
                                                                                                                                                                                                              548,515.60
                                                                                                                                                                                                              Credit card Logo

                                                                                                                                                                                                              Related Reports


                                                                                                                                                                                                              Reason to Buy

                                                                                                                                                                                                              Request for Sample of this report