Report Detail

Service & Software Global Data Center Construction Market Size, Status and Forecast 2019-2025

  • RnM2841148
  • |
  • 29 April, 2019
  • |
  • Global
  • |
  • 93 Pages
  • |
  • QYResearch
  • |
  • Service & Software

A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.

Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.

Data center construction primarily focuses on designing and building a data center using these key factors:

Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.

Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.

Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
A data center is used to house an enterprise IT infrastructure. They constitute the backbone of essential business operations. The demand for cloud-based services is increasing among enterprises including many Fortune 500 companies. Several industries are making use of advanced technologies to gain a competitive advantage. The complexities associated with business applications have increased because of the enormous growth in data volumes. This has triggered a greater need for construction and renovation of data centers. Enterprises are focusing on constructing green data centers to reduce power consumption and environmental impact. The construction of a data center includes design, architecture, installation of electrical and mechanical systems, and incorporation of security mechanisms. Infrastructure certifications also play a vital role in the building of data center facilities.
Internet of things (IoT), which requires a data center, is experiencing tremendous growth. Data centers are more suitable for storing and processing data generated by devices connected to the internet, and also to meet the demand for real-time computing. Therefore, the market is set to witness an increase in data centers that are reliable and scalable in nature. The growing demand for cloud computing and big data analytics are also assumed to have an impact on this market, thereby driving the growth of the Latin America Data Center Construction market during the forecast period.
In 2018, the global Data Center Construction market size was xx million US$ and it is expected to reach xx million US$ by the end of 2025, with a CAGR of xx% during 2019-2025.

This report focuses on the global Data Center Construction status, future forecast, growth opportunity, key market and key players. The study objectives are to present the Data Center Construction development in United States, Europe and China.

The key players covered in this study
Aceco TI
AECOM
Turner Construction
Equinix
Fluor
DPR Construction
Constructora Sudamericana S.A.
...

Market segment by Type, the product can be split into
Electrical Construction
Mechanical Construction
General Construction

Market segment by Application, split into
Finance
Internet
Telecommunications
Government
Others

Market segment by Regions/Countries, this report covers
United States
Europe
China
Japan
Southeast Asia
India
Central & South America

The study objectives of this report are:
To analyze global Data Center Construction status, future forecast, growth opportunity, key market and key players.
To present the Data Center Construction development in United States, Europe and China.
To strategically profile the key players and comprehensively analyze their development plan and strategies.
To define, describe and forecast the market by product type, market and key regions.

In this study, the years considered to estimate the market size of Data Center Construction are as follows:
History Year: 2014-2018
Base Year: 2018
Estimated Year: 2019
Forecast Year 2019 to 2025
For the data information by region, company, type and application, 2018 is considered as the base year. Whenever data information was unavailable for the base year, the prior year has been considered.


Table of Contents

    1 Report Overview

    • 1.1 Study Scope
    • 1.2 Key Market Segments
    • 1.3 Players Covered
    • 1.4 Market Analysis by Type
      • 1.4.1 Global Data Center Construction Market Size Growth Rate by Type (2014-2025)
      • 1.4.2 Electrical Construction
      • 1.4.3 Mechanical Construction
      • 1.4.4 General Construction
    • 1.5 Market by Application
      • 1.5.1 Global Data Center Construction Market Share by Application (2014-2025)
      • 1.5.2 Finance
      • 1.5.3 Internet
      • 1.5.4 Telecommunications
      • 1.5.5 Government
      • 1.5.6 Others
    • 1.6 Study Objectives
    • 1.7 Years Considered

    2 Global Growth Trends

    • 2.1 Data Center Construction Market Size
    • 2.2 Data Center Construction Growth Trends by Regions
      • 2.2.1 Data Center Construction Market Size by Regions (2014-2025)
      • 2.2.2 Data Center Construction Market Share by Regions (2014-2019)
    • 2.3 Industry Trends
      • 2.3.1 Market Top Trends
      • 2.3.2 Market Drivers
      • 2.3.3 Market Opportunities

    3 Market Share by Key Players

    • 3.1 Data Center Construction Market Size by Manufacturers
      • 3.1.1 Global Data Center Construction Revenue by Manufacturers (2014-2019)
      • 3.1.2 Global Data Center Construction Revenue Market Share by Manufacturers (2014-2019)
      • 3.1.3 Global Data Center Construction Market Concentration Ratio (CR5 and HHI)
    • 3.2 Data Center Construction Key Players Head office and Area Served
    • 3.3 Key Players Data Center Construction Product/Solution/Service
    • 3.4 Date of Enter into Data Center Construction Market
    • 3.5 Mergers & Acquisitions, Expansion Plans

    4 Breakdown Data by Type and Application

    • 4.1 Global Data Center Construction Market Size by Type (2014-2019)
    • 4.2 Global Data Center Construction Market Size by Application (2014-2019)

    5 United States

    • 5.1 United States Data Center Construction Market Size (2014-2019)
    • 5.2 Data Center Construction Key Players in United States
    • 5.3 United States Data Center Construction Market Size by Type
    • 5.4 United States Data Center Construction Market Size by Application

    6 Europe

    • 6.1 Europe Data Center Construction Market Size (2014-2019)
    • 6.2 Data Center Construction Key Players in Europe
    • 6.3 Europe Data Center Construction Market Size by Type
    • 6.4 Europe Data Center Construction Market Size by Application

    7 China

    • 7.1 China Data Center Construction Market Size (2014-2019)
    • 7.2 Data Center Construction Key Players in China
    • 7.3 China Data Center Construction Market Size by Type
    • 7.4 China Data Center Construction Market Size by Application

    8 Japan

    • 8.1 Japan Data Center Construction Market Size (2014-2019)
    • 8.2 Data Center Construction Key Players in Japan
    • 8.3 Japan Data Center Construction Market Size by Type
    • 8.4 Japan Data Center Construction Market Size by Application

    9 Southeast Asia

    • 9.1 Southeast Asia Data Center Construction Market Size (2014-2019)
    • 9.2 Data Center Construction Key Players in Southeast Asia
    • 9.3 Southeast Asia Data Center Construction Market Size by Type
    • 9.4 Southeast Asia Data Center Construction Market Size by Application

    10 India

    • 10.1 India Data Center Construction Market Size (2014-2019)
    • 10.2 Data Center Construction Key Players in India
    • 10.3 India Data Center Construction Market Size by Type
    • 10.4 India Data Center Construction Market Size by Application

    11 Central & South America

    • 11.1 Central & South America Data Center Construction Market Size (2014-2019)
    • 11.2 Data Center Construction Key Players in Central & South America
    • 11.3 Central & South America Data Center Construction Market Size by Type
    • 11.4 Central & South America Data Center Construction Market Size by Application

    12 International Players Profiles

    • 12.1 Aceco TI
      • 12.1.1 Aceco TI Company Details
      • 12.1.2 Company Description and Business Overview
      • 12.1.3 Data Center Construction Introduction
      • 12.1.4 Aceco TI Revenue in Data Center Construction Business (2014-2019)
      • 12.1.5 Aceco TI Recent Development
    • 12.2 AECOM
      • 12.2.1 AECOM Company Details
      • 12.2.2 Company Description and Business Overview
      • 12.2.3 Data Center Construction Introduction
      • 12.2.4 AECOM Revenue in Data Center Construction Business (2014-2019)
      • 12.2.5 AECOM Recent Development
    • 12.3 Turner Construction
      • 12.3.1 Turner Construction Company Details
      • 12.3.2 Company Description and Business Overview
      • 12.3.3 Data Center Construction Introduction
      • 12.3.4 Turner Construction Revenue in Data Center Construction Business (2014-2019)
      • 12.3.5 Turner Construction Recent Development
    • 12.4 Equinix
      • 12.4.1 Equinix Company Details
      • 12.4.2 Company Description and Business Overview
      • 12.4.3 Data Center Construction Introduction
      • 12.4.4 Equinix Revenue in Data Center Construction Business (2014-2019)
      • 12.4.5 Equinix Recent Development
    • 12.5 Fluor
      • 12.5.1 Fluor Company Details
      • 12.5.2 Company Description and Business Overview
      • 12.5.3 Data Center Construction Introduction
      • 12.5.4 Fluor Revenue in Data Center Construction Business (2014-2019)
      • 12.5.5 Fluor Recent Development
    • 12.6 DPR Construction
      • 12.6.1 DPR Construction Company Details
      • 12.6.2 Company Description and Business Overview
      • 12.6.3 Data Center Construction Introduction
      • 12.6.4 DPR Construction Revenue in Data Center Construction Business (2014-2019)
      • 12.6.5 DPR Construction Recent Development
    • 12.7 Constructora Sudamericana S.A.
      • 12.7.1 Constructora Sudamericana S.A. Company Details
      • 12.7.2 Company Description and Business Overview
      • 12.7.3 Data Center Construction Introduction
      • 12.7.4 Constructora Sudamericana S.A. Revenue in Data Center Construction Business (2014-2019)
      • 12.7.5 Constructora Sudamericana S.A. Recent Development

    13 Market Forecast 2019-2025

    • 13.1 Market Size Forecast by Regions
    • 13.2 United States
    • 13.3 Europe
    • 13.4 China
    • 13.5 Japan
    • 13.6 Southeast Asia
    • 13.7 India
    • 13.8 Central & South America
    • 13.9 Market Size Forecast by Product (2019-2025)
    • 13.10 Market Size Forecast by Application (2019-2025)

    14 Analyst's Viewpoints/Conclusions

      15 Appendix

      • 15.1 Research Methodology
        • 15.1.1 Methodology/Research Approach
          • 15.1.1.1 Research Programs/Design
          • 15.1.1.2 Market Size Estimation
          • 12.1.1.3 Market Breakdown and Data Triangulation
        • 15.1.2 Data Source
          • 15.1.2.1 Secondary Sources
          • 15.1.2.2 Primary Sources
      • 15.2 Disclaimer

      Summary:
      Get latest Market Research Reports on Data Center Construction . Industry analysis & Market Report on Data Center Construction is a syndicated market report, published as Global Data Center Construction Market Size, Status and Forecast 2019-2025. It is complete Research Study and Industry Analysis of Data Center Construction market, to understand, Market Demand, Growth, trends analysis and Factor Influencing market.

      Last updated on

      REPORT YOU MIGHT BE INTERESTED

      Purchase this Report

      $3,900.00
      $5,850.00
      $7,800.00
      3,018.60
      4,527.90
      6,037.20
      3,599.70
      5,399.55
      7,199.40
      576,537.00
      864,805.50
      1,153,074.00
      339,846.00
      509,769.00
      679,692.00
      Credit card Logo

      Related Reports


      Reason to Buy

      Request for Sample of this report